ENTREPRISE GICA ZAHANA
The works included the supply of refractory products adapted to high-temperature operations.Installation of maintenance refractories was carried out to ensure continuous kiln performance.Mechanical maintenance services were performed on critical process equipment.Repairs were executed on the preheating tower, including the smoke box, cyclone, and cooler.These interventions enhanced the reliability, durability, and efficiency of the cement production line.
docs/furnace-renovation.pdf
ENTREPRISE GICA SME
The project involved the emptying of cement elevators, including maintenance of elevator bottoms.Silos were emptied with removal of stored materials, which were directed for recycling.Repairs were performed on material transport crates to restore their functionality.A complete replacement of the canvas was carried out to ensure durability and efficiency.These operations contributed to improving safety, reliability, and the sustainability of material handling processes.
docs/furnace-renovation.pdf
ENTREPRISE GICA AIN KBIRA
The project included the supply of high-quality refractory materials tailored for industrial use.Installation works were carried out for maintenance refractories to ensure reliable kiln operation.Specialized teams executed mechanical maintenance activities on critical equipment.Repairs were undertaken on the preheating tower to restore its efficiency and stability.These combined interventions improved the durability, safety, and performance of the cement production process
docs/furnace-renovation.pdf
ENTREPRISE GICA AIN TOUTA
SUPPLY OF REFRACTORY CONCRETE
docs/furnace-renovation.pdf
ENTREPRISE GICA CHLEF
SUPPLY OF REFRACTORY CONCRETE
docs/furnace-renovation.pdf
BISKRIA CEMENT
The mechanical maintenance works covered key equipment such as chains, conveyor belts, and elevators.Operations included inspection, adjustment, and replacement of worn components to ensure continuous performance.Preventive maintenance measures were implemented to minimize unexpected breakdowns.Corrective interventions were carried out to restore damaged parts to full functionality.These actions ensured the reliability, safety, and efficiency of material handling systems.
docs/furnace-renovation.pdf
ENTREPRISE GICA SCIBS
he repair of the chimney ceiling involved the installation of prefabricated concrete elements designed to restore structural integrity.Damaged sections of the boilerwork were dismantled and fully reconstructed to ensure safety and functionality.The works were carried out with strict adherence to technical standards and quality requirements.Special attention was given to durability and resistance to high operating conditions.These repairs contributed to extending the service life and reliability of the chimney system.
docs/furnace-renovation.pdf
ENTREPRISE LAFARG HOLCIM
The chimney and refractory works comprised the pouring of concrete using vibrated formwork and shotcrete for the roof and sidewalls of the heating hood of the grey cement rotary kiln. Additional shotcrete was applied to the vault and periphery of the kiln, while vibrated formwork was also executed for the spoon and feed chute floor. The project further included refractory masonry works to strengthen and protect the grey cement rotary kiln, ensuring its reliability and durability.
docs/furnace-renovation.pdf
ENTREPRISE LAFARG HOLCIM
Furnishing and refractory works, including the pouring of vibrated concrete on the circular surface of the nose-ring of the grey rotary cement kiln. Installation of cut bricks with clamping plates, both transverse and simple. First installation in Algeria of AGE bricks with mortar in the firing zone of a 5mL grey cement rotary kiln.
docs/furnace-renovation.pdf
ENTREPRISE LAFARG HOLCIM
The chimney and refractory works included the pouring of vibrated concrete using formwork and shotcrete for the roof and sidewalls of the heating hood of the grey cement rotary kiln. Shotcrete was also applied to the vault and periphery of the kiln, while vibrated formwork was executed for the spoon and feed chute floor. In addition, refractory masonry works were carried out to ensure the proper lining and durability of the grey cement rotary kiln.
docs/furnace-renovation.pdf
ENTREPRISE LAFARG HOLCIM
The chimney and refractory works involved the pouring of vibrated concrete, using both formwork and shotcrete, for the roof and sidewalls of the heating hood of the grey cement rotary kiln. Shotcrete was also applied to the vault and periphery of the kiln, while vibrated formwork was executed for the spoon and the feed chute floor. Furthermore, refractory masonry works were completed to ensure optimal lining, protection, and long-term durability of the grey cement rotary kiln.
docs/furnace-renovation.pdf
SONATRACH RAFFENERIE ALGER
Refractory repair works, including gunning, vibrated casting, and anchor welding, were carried out on the regenerator 530-R-002 of the RGCC unit at the Algiers refinery. The project mobilized dedicated human resources, namely one HSE Manager, two Refractory Supervisors, six Refractory Masons, three Welders, and five Certified Multi-skilled Workers. In addition, all required equipment was provided to ensure the safe and efficient execution of the works in full compliance with industry standards.
docs/furnace-renovation.pdf
SONATRACH RAFFENERIE GP2Z
Refractory repair works, including gunning, vibrated casting, and anchor welding, are being executed on the regenerator 530-R-002 of the RGCC unit at the Algiers refinery. The project mobilizes the following human resources: one HSE Manager, two Refractory Supervisors, six Refractory Masons, three Welders, and five Certified Multi-skilled Workers. In addition, all necessary equipment has been provided to ensure safe and efficient execution of the works in strict compliance with industry standards.
docs/furnace-renovation.pdf
SONATRACH RAFFENERIE ADRAR
Refractory repair works, including gunning, vibrated casting, and anchor welding, are being carried out on the regenerator 530-R-002 of the RGCC unit at the Algiers refinery. The project mobilizes the following human resources: one HSE Manager, two Refractory Supervisors, six Refractory Masons, three Welders, and five Certified Multi-skilled Workers. In addition, all required equipment is supplied to ensure the works are executed safely and efficiently, in full compliance with industry standards.
docs/furnace-renovation.pdf
SONATRACH RAFFENERIE OHANET
yet to add...
docs/furnace-renovation.pdf
SORFERT
Furnace and refractory works were carried out on the ammonia and urea production furnace, covering several critical components. The scope included the application of vibrated castable concrete and primary guniting on the Reformer Bellows (2038001 / 2038203), vibrated castable concrete and guniting on the Steam Super Heater (203E002), as well as refractory works with vibrated castable concrete and guniting on the Process Gas Cooler (2038).
docs/furnace-renovation.pdf
AOA EL SHARIKA EL OMANIA LIL ASMIDA
Furnace and refractory works were carried out on the ammonia and urea production furnace, covering the following components: vibrated castable concrete and primary guniting on the Reformer Bellows (2038001 / 2038203); vibrated castable concrete and guniting on the Steam Super Heater (203E002); and vibrated castable concrete with guniting on the Process Gas Cooler (2038).
docs/furnace-renovation.pdf
FERTIAL
A refractory drying intervention was carried out, including the installation of a complete drying system comprising a burner, hot air ducts, as well as flow and temperature control dampers. In addition, furnace works were performed on Furnace 101 B of the Ammonia Unit at the client’s site in Annaba, with the supply and application of refractory mortar.
docs/furnace-renovation.pdf
METAL SIDER
The works included maintenance and repair operations on various industrial furnaces.Specialized interventions were performed to restore furnace efficiency and prolong service life.The project also involved the supply of high-performance refractory concrete.These materials were selected for their resistance to high thermal and mechanical stresses.Together, these actions ensured durability, safety, and reliability of the furnaces in operation.
docs/furnace-renovation.pdf
TOSYALI ALGERIE
A turnover of 12,487 KDA was achieved through several interventions carried out by our team of 14 Réfratech specialists. These works involved refractory maintenance and repairs on the furnaces of the TOSYALI rebar plant in Oran during the first eight months of 2025.
docs/furnace-renovation.pdf
AQS QATARI STEEL
Shutdown program for maintenance works of the DRP Unit (Lot 05) of the AQS Complex, including the supply of refractory concretes and refractory repairs of the DRI shaft furnaces, the refractory-lined duct of the DRI furnace, and the DRI unit of the AQS Complex.
docs/furnace-renovation.pdf
KNAUF
The industrial mechanical assembly and installation of the new line included the assembly of new dryers with connection to the existing dryer, the complete installation of the compressed air piping network, and the assembly of belt conveyors. The works also comprised the erection of a multi-storey preparation tower incorporating the steel structure and mechanical equipment, the development of a finished product recovery area (plasterboard), the renovation of the combustion chamber, and the extension of the electrical room.
docs/furnace-renovation.pdf
COLPA
SUPPLY OF REFRACTORY CONCRETE
docs/furnace-renovation.pdf
GYPLAC
SUPPLY OF REFRACTORY CONCRETE
docs/furnace-renovation.pdf
TAOUAB
A turnover of 7,278 KDA was achieved during the first eight months of 2025 through the interventions of our team of 14 Réfratech specialists on the refractory refurbishment works of the furnace at the SARL TAOUAB plaster plant in M’Sila, as well as by our team of 6 specialists on the refractory repair works of the furnace at the plaster plant in the wilaya of Ouled Djellal.
docs/furnace-renovation.pdf
ALGAL+
The works included the supply of refractories, the installation of maintenance refractories, and mechanical maintenance operations.